15:15 | <Jack Works> |
The pattern-matching champion group designed this proposal with a layering approach. It does not mean the proposal is an MVP. The champion group wishes to ship the proposal as a whole when possible, but we can drop some features if there is strong pushback from the committee.
This approach allows the champion group to consider how all features combine and also how the proposal should behave if any of the features are missing.
I hope this is the consensus, am I wrong? MVP may leads to another class design in my pov
|